Completed Projects
- Since 2016 we have built 6 classrooms
- 3 teachers’ houses (each 4 roomed.) equipped with a 4-plate gas stove.
- 8 Blair toilets
- Drilled a bore hole and supply piped water to the school ( 5000 L tank).
- Installed solar system to the school ( 4 classrooms are yet to be installed)
- Bought bikes for each teacher.
- Fenced the school
- Gardening project on-going
- School auditorium
- School science laboratory
- Administration office
- Mission duplex house